Flegg High School, Norfolk

This Project was a school boiler room refurbishment including a Biomass Boiler Installation, working alongside the main contractor the installation was completed over the school holidays. Working to design drawings the boiler room was rewired and all the controls were installed and connected, once the installation was complete it was commissioned using a laptop and computer software.

Contact Us

For more information or to to discuss your requirements please contact us on 01603 483307 or email us at info@lecway.co.uk.